North Wastewater Collection System Improvements PH 1
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Dodge USA
Project scope includes CRRUA North wastewater collection system improvements in Santa Teresa and Sunland Park, New Mexico including the CRRUA Lift Station #7 forcemain pipeline upsize from 6-inch to 10-inch, McNutt gravity collection system upsize from 8-inch or 10-inch pipelines to 18-inch or 24- inch pipelines and replacement of existing sewer manholes, Dagger Lift Station and forcemain pipeline
- Status
- Closed
- Sector
- Car parking, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Santa Teresa, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Wastewater Collection System Improvements PH 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project scope includes CRRUA North wastewater collection system improvements in Santa Teresa and Sunland Park, New Mexico including the CRRUA Lift Station #7 forcemain pipeline upsize from 6-inch to 10-inch, McNutt gravity collection system upsize from 8-inch or 10-inch pipelines to 18-inch or 24- inch pipelines and replacement of existing sewer manholes, Dagger Lift Station and forcemain pipeline removal and replacement, and South Lift Station and forcemain removal and replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Santa Teresa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
