North Wells Development Electrical Distribution Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of a new electrical distribution system upgrades to the Town s new development on the north end of the Town of Pine Bluffs, Wyoming. The electrical distribution system upgrades includes demolition of old overhead distribution power poles, new underground cables, sectionalizing enclosures, and transformers so the medium voltage distribution infrastructure is in place for the Owner to e
- Status
- Closed
- Sector
- Telecommunications, Power Generation (CCGT), Government, Commercial
- Location
- Pine Bluffs, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Wells Development Electrical Distribution Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new electrical distribution system upgrades to the Town s new development on the north end of the Town of Pine Bluffs, Wyoming. The electrical distribution system upgrades includes demolition of old overhead distribution power poles, new underground cables, sectionalizing enclosures, and transformers so the medium voltage distribution infrastructure is in place for the Owner to easily connect new customers as the North Wells lots are developed. The electrical portion of the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Pine Bluffs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
