North West Shelf LNG Project Disruption
Sector: LNG • Location: Karratha, Western Australia, Australia
Source: Baird Maritime
The North West Shelf LNG project, Australia's oldest and second-largest LNG project producing 14.3 million tonnes a year, had production disrupted by the cyclone with one of its five production trains shut down. The onshore processing facility is the Karratha gas plant.
- Status
- Failure
- Sector
- LNG, Seaport, Natural Gas
- Location
- Karratha, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Baird Maritime
ConstructChat
Ask ConstructChat about North West Shelf LNG Project Disruption
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | disrupted |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The North West Shelf LNG project, Australia's oldest and second-largest LNG project producing 14.3 million tonnes a year, had production disrupted by the cyclone with one of its five production trains shut down. The onshore processing facility is the Karratha gas plant. |
Original sector | Energy |
Location
Country | Australia |
State | Western Australia |
City | Karratha |
Source
Source | Baird Maritime |
URL |
More Details
Record type | Project |
Sector | LNG, Seaport, Natural Gas |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
