North West Thermal Power Plant

Sector: Power Generation (CCGT) • Location: Russian Federation

Source: World Bank Group

Project
Concluded

On February 24, 2003, an Italian/Russian consortium Enel ESN Energo won a contract to manage the North West Thermal Power Plant (NWTPP) in St. Petersburg, Russia. The NWTPP, the most technologically advanced thermal power plant in Russia, was located near St. Petersburg in the Northwest region of Russia and utilized combined cycle gas turbine (CCGT) technology. The plant, a 450MW combined cycle un

Project Information FAQ

Project Information

5 Q
The project “North West Thermal Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Russian Federation. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On February 24, 2003, an Italian/Russian consortium Enel ESN Energo won a contract to manage the North West Thermal Power Plant (NWTPP) in St. Petersburg, Russia. The NWTPP, the most technologically advanced thermal power plant in Russia, was located near St. Petersburg in the Northwest region of Russia and utilized combined cycle gas turbine (CCGT) technology. The plant, a 450MW combined cycle unit producing 3.4TWh per year, supplied electricity to the Russian wholesale electricity market and Fortum, the Finnish energy group. The main shareholders of NWTPP were RAO UES (46.7%), OAO Lenenergo (13.8%), Lentransgaz (12.3%), the St. Petersburg State Property Management Committee (7.5%) and the state-run company Technopromexport (3.7%). Unified Energy Systems (UES) held a competitive tender for the management of Russia's North-West thermal power plant in February 2003. UES was looking for a European utility to manage the power plant as part of Russia's attempt to lure private investment into the country's aging electricity sector. Fortum, the Finnish energy group, and Enel, the Italian utility, submitted their bids. The Germany's RWE and France's EdF, both of which expressed an interest in the management tender, decided not to bid. The requirements for the bidders for the management rights on the North West thermal power plant were set the UES Board of Directors in September of 2003 as follows: (i) annual turnover of $5 billion (ii) a generating capacity of 5,000 MW (iii) a credit rating from S&P and Fitch not lower than BBB-, and not lower than Baa3 from Moody's. Enel ESN Energo LLC (EEE) - a 50-50 joint venture - won the tender to manage NWTTP for three years, with the possibility of a one-year extension. In June 2004, RAO Unified Energy System of Russia (RAO UESR) signed a three-year management contract with Enel ESN Energo. Under the terms of the management agreement the consortium would become the management company for the NWTPP, assuming responsibility for day-to-day management and operations, overseeing the development of the plant’s second generating unit, and arranging for the financing of up to US$125 million to complete its construction. The power plant’s first unit, which had an installed capacity of 450 MW, was commissioned in December 2000. The second unit, which was planned to have an installed capacity of 450 MW, was under construction and was expected to be completed in 2006. The management tender held by RAO EUS in February 2003, was part of Russia's general reform of the power sector, which aimed to restructure national utility Unified Energy System (UES) and to attract foreign capital to the industry. With a market capitalization exceeding US$11 billion and FY03 revenues of US$19.6 billion, RAO UES operated Russia’s unified power system, controlling more than 70 percent of the country’s electric power grid. The capacity was calculated as 450 of existing capacity and 450 MW under construction at the time the management contract was signed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data