logo

Northbound Howard Frankland Express Lanes and Shared-Use Bridge Path

Sector: Bridge • Location: Tampa, Florida, USA

Source: Patch

Project
Completed

The Florida Department of Transportation (FDOT) opened new northbound express lanes on Interstate 275 across the new Howard Frankland Bridge, along with a new shared-use path for pedestrians and cyclists. The express lanes run from 4th Street North in St. Petersburg to just north of the bridge in Tampa, separated from general-use lanes by barriers. The shared-use path is 12 feet wide, nearly seven

Status
Closed
Sector
Bridge
Location
Tampa, Florida, United States of America
Updated
22 Jul 2026
Source
Patch

ConstructChat

Ask ConstructChat about Northbound Howard Frankland Express Lanes and Shared-Use Bridge Path

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Northbound Howard Frankland Express Lanes and Shared-Use Bridge Path” is an infrastructure initiative in the Bridge sector, located in Tampa, Florida, USA. Taiyo aggregates data on it from Patch.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Florida Department of Transportation (FDOT) opened new northbound express lanes on Interstate 275 across the new Howard Frankland Bridge, along with a new shared-use path for pedestrians and cyclists. The express lanes run from 4th Street North in St. Petersburg to just north of the bridge in Tampa, separated from general-use lanes by barriers. The shared-use path is 12 feet wide, nearly seven miles long, and includes overlooks for viewing Old Tampa Bay. Additional future connections are under separate construction projects.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Florida

City

Tampa

Source

Source

Patch

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project