Northeast Transmission Main Project
Sector: Water Supply and Storage • Location: Sheridan, Wyoming, United States
Source: Sheridan Media
The Northeast Transmission Main Project involves the installation of approximately 10,800 linear feet of a 16-inch-diameter water transmission main and associated appurtenances in northeast Sheridan. This project aims to extend the water supply system through an area of Sheridan that is underserved, both in location and capacity, as outlined in the 2019 Sheridan Water System Master Plan.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Sheridan, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Sheridan Media
ConstructChat
Ask ConstructChat about Northeast Transmission Main Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Northeast Transmission Main Project involves the installation of approximately 10,800 linear feet of a 16-inch-diameter water transmission main and associated appurtenances in northeast Sheridan. This project aims to extend the water supply system through an area of Sheridan that is underserved, both in location and capacity, as outlined in the 2019 Sheridan Water System Master Plan. |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Sheridan |
Source
Source | Sheridan Media |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
