Northern Bangkok Water Project
Sector: Water Supply and Storage • Location: Thailand
Source: World Bank Group
In June 1999, Thames Water (a subsidiary of RWE of the UK) won a five-year concession contract with the Provincial Water Authority of Thailand (PWA) to rehabilitate and manage water distribution in an area north of Bangkok. Thames Water also held a water production contract in Pathum Thani that it won in 1995, in which it was partners with Ch Karnchang.
Thames Water was to reduce leakages
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Power Generation (CCGT)
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Northern Bangkok Water Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In June 1999, Thames Water (a subsidiary of RWE of the UK) won a five-year concession contract with the Provincial Water Authority of Thailand (PWA) to rehabilitate and manage water distribution in an area north of Bangkok. Thames Water also held a water production contract in Pathum Thani that it won in 1995, in which it was partners with Ch Karnchang. Thames Water was to reduce leakages in the Pathum Thani-Rangsit region through technology already in use in Indonesia and Malaysia. The high levels of water loss (up to 50% in some areas) had resulted in constant reduced pressure and supply failure. The project aimed to provide 24 hour pressurized supply through the north Bangkok area. The project required an estimated investment of US$25 million. The project reached financial closure in June 1999 and construction began in December 1999. The project concluded in 2004. According to reports, Thames managed to reduce the NRW in the area from 60% to 30% in the first three years of the contract. None None |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project