Northern Breeze Energy Wind Farm
The owner, status and timeline of this project. A free account opens every field.
Source: Your Thunder Bay
A future 200-megawatt wind farm to be located about 30 kilometres north of Thunder Bay. The project is a joint venture with Fort William First Nation and Red Rock Indian Band holding a 50% stake. Construction is planned to start in 2028 with an in-service date in 2030. The project cost is estimated between $650 million to $700 million.
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Road
- Location
- Thunder Bay, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Your Thunder Bay
ConstructChat
Ask ConstructChat about Northern Breeze Energy Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A future 200-megawatt wind farm to be located about 30 kilometres north of Thunder Bay. The project is a joint venture with Fort William First Nation and Red Rock Indian Band holding a 50% stake. Construction is planned to start in 2028 with an in-service date in 2030. The project cost is estimated between $650 million to $700 million. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Ontario |
City | Thunder Bay |
Source
Source | Your Thunder Bay |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Road |
Article published date | 2026-04-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
