logo

NORTHERN REGION TRANSMISSION PROJECT

Sector: Power Transmission • Location: India

Source: World Bank Group

Project
Closed

The primary aim of this project is to improve operating efficiency, reliability and quality of service in India's northern region electric system. These improvements will be effected through the provision of : a) transmission lines and substations; b) a load dispatch system to control power system operations; and c) an economic and commercial framework to encourage better use of the available ener

Project Information FAQ

Project Information

5 Q
The project “NORTHERN REGION TRANSMISSION PROJECT” is an infrastructure initiative in the Power Transmission sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The primary aim of this project is to improve operating efficiency, reliability and quality of service in India's northern region electric system. These improvements will be effected through the provision of : a) transmission lines and substations; b) a load dispatch system to control power system operations; and c) an economic and commercial framework to encourage better use of the available energy. Components include : 1) over 3,000 circuit km of high voltage transmission lines; 2) 2,500 MVA of substation capacity; 3) several control centers; 4) a communication system; and 5) compensatory afforestation. The project will strengthen NHPC's organization and help develop the newly formed National Power Transmission Corporation (NPTC). The technical risks associated with the first time use of 765 kV lines and the use of 400kV lines at high altitudes are being managed by employing suitable consultants.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data