Northern Reliability Project
Planned · Minnesota · Last reported Jan 2025
Source: Duluth News Tribune
The Northern Reliability Project is a planned 180-mile, 345-kilovolt transmission line that will link the Iron Range to central Minnesota. It is being developed jointly by Minnesota Power and Great River Energy, with construction expected to begin in late 2025 and operational by 2030.
- Status
- Prospective
- Sector
- Metal, Steel, Power Generation (CCGT)
- Location
- Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Duluth News Tribune
ConstructChat
Ask ConstructChat about Northern Reliability Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Northern Reliability Project is a planned 180-mile, 345-kilovolt transmission line that will link the Iron Range to central Minnesota. It is being developed jointly by Minnesota Power and Great River Energy, with construction expected to begin in late 2025 and operational by 2030. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Duluth News Tribune |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
