logo
ProjectClosed

Northgate Ranch Phase 3 Section 12a

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge

Scope of Work of the Contract Documents includes the following: Drainage improvements including approximately 18 36 Drainage RCP, Manholes, Headwalls and appurtenances; Water Piping, including 8 mains, valves and appurtenances; Wastewater Piping consisting of 8 PVC Mains, and appurtenances; Batch Detention Ponds; Excavation, Embankment and Paving; Sedimentation and Erosion Controls; Subdivision Im

Status
Closed
Sector
Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Commercial, Government
Location
Georgetown, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Northgate Ranch Phase 3 Section 12a

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Northgate Ranch Phase 3 Section 12a” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Georgetown, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of Work of the Contract Documents includes the following: Drainage improvements including approximately 18 36 Drainage RCP, Manholes, Headwalls and appurtenances; Water Piping, including 8 mains, valves and appurtenances; Wastewater Piping consisting of 8 PVC Mains, and appurtenances; Batch Detention Ponds; Excavation, Embankment and Paving; Sedimentation and Erosion Controls; Subdivision Improvements including Sidewalk, Curb & Gutter, Signage & Striping and various other improvements.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Georgetown

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Commercial, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project