Northland Reliability Project

Sector: Metal • Location: Taconite, Minnesota, United States of America

Source: Dodge

Project
Planning Schematics

Modified proposed route. To be built in two sections: Approximately 180-mile, double-circuit 345-kV transmission line, primarily following existing transmission corridors, from northern Minnesota to central Minnesota near Becker to support grid reliability in the Upper Midwest. Segment One will build about 130 miles of new transmission lines from Minnesota Power's Iron Range Substation in Itasca C

Status
Prospective
Sector
Metal, Road, Commercial, Power Transmission, Power Generation (CCGT), Steel
Location
Taconite, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Northland Reliability Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Northland Reliability Project” is an infrastructure initiative in the Metal sector, located in Taconite, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Modified proposed route. To be built in two sections: Approximately 180-mile, double-circuit 345-kV transmission line, primarily following existing transmission corridors, from northern Minnesota to central Minnesota near Becker to support grid reliability in the Upper Midwest. Segment One will build about 130 miles of new transmission lines from Minnesota Power's Iron Range Substation in Itasca County to Great River Energy's Benton County Substation in Benton County near St. Cloud. Segment T...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Taconite

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Road, Commercial, Power Transmission, Power Generation (CCGT), Steel

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project