Northland Reliability Project
Sector: Metal • Location: Taconite, Minnesota, United States of America
Source: Dodge USA
Modified proposed route. To be built in two sections: Approximately 180-mile, double-circuit 345-kV transmission line, primarily following existing transmission corridors, from northern Minnesota to central Minnesota near Becker to support grid reliability in the Upper Midwest. Segment One will build about 130 miles of new transmission lines from Minnesota Power's Iron Range Substation in Itasca C
- Status
- Prospective
- Sector
- Metal, Power Generation (CCGT), Road, Power Transmission, Commercial, Steel
- Location
- Taconite, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Northland Reliability Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modified proposed route. To be built in two sections: Approximately 180-mile, double-circuit 345-kV transmission line, primarily following existing transmission corridors, from northern Minnesota to central Minnesota near Becker to support grid reliability in the Upper Midwest. Segment One will build about 130 miles of new transmission lines from Minnesota Power's Iron Range Substation in Itasca County to Great River Energy's Benton County Substation in Benton County near St. Cloud. Segment T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Taconite |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Power Generation (CCGT), Road, Power Transmission, Commercial, Steel |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
