Norway's Largest AI Data Centre by Bitdeer
One of 3,097 projects Taiyo tracks in Norway.
Source: 디지털투데이
Bitdeer Technologies Group plans to develop Norway's largest AI data centre by converting an existing facility through its subsidiary Tidal Data Center. The project is designed to operate Nvidia's next-generation AI platform Vera Rubin and is being built by Data Center Installations. The data centre is expected to have a total power capacity of 180 megawatts and aims to be among the largest in Eur
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Data Center
- Location
- Norway
- Updated
- 22 Jul 2026
- Source
- 디지털투데이
ConstructChat
Ask ConstructChat about Norway's Largest AI Data Centre by Bitdeer
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bitdeer Technologies Group plans to develop Norway's largest AI data centre by converting an existing facility through its subsidiary Tidal Data Center. The project is designed to operate Nvidia's next-generation AI platform Vera Rubin and is being built by Data Center Installations. The data centre is expected to have a total power capacity of 180 megawatts and aims to be among the largest in Europe by installed capacity. |
Original sector | Technology |
Location
Country | Norway |
Source
Source | 디지털투데이 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
