logo

Notsi Solar Project

Sector: Energy Storage • Location: Free State, South Africa

Source: SolarQuarter

Project
Under Construction

The Notsi solar photovoltaic project is a large-scale solar power facility with a generation capacity of 475 MWac (620 MWdc) located in the Free State, South Africa. The project spans around 1,000 hectares and includes more than 860,000 solar panels. It is planned as a standalone solar facility with future plans to integrate a battery energy storage system (BESS) to enhance grid stability and effi

Project Information FAQ

Project Information

4 Q
The project “Notsi Solar Project” is an infrastructure initiative in the Energy Storage sector, located in Free State, South Africa. Taiyo aggregates data on it from SolarQuarter.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Notsi solar photovoltaic project is a large-scale solar power facility with a generation capacity of 475 MWac (620 MWdc) located in the Free State, South Africa. The project spans around 1,000 hectares and includes more than 860,000 solar panels. It is planned as a standalone solar facility with future plans to integrate a battery energy storage system (BESS) to enhance grid stability and efficiency. The project has secured environmental approvals for the addition of battery storage and has achieved financial closure supported by long-term power purchase agreements with energy traders Discovery Green and NOA. Construction is assigned to a joint venture involving China Energy Engineering Corporation and the Northwest Electric Power Design Institute, with an expected construction duration of approximately 26 months. Anthem is also developing the Artemis Main Transmission Substation as part of the project, which will be transferred to Eskom later.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data