logo
ProjectUnder Construction

Notsi Solar Project

Under construction · Free State · Last reported Mar 2026

Source: SolarQuarter

The Notsi solar photovoltaic project is a large-scale solar power facility with a generation capacity of 475 MWac (620 MWdc) located in the Free State, South Africa. The project spans around 1,000 hectares and includes more than 860,000 solar panels. It is planned as a standalone solar facility with future plans to integrate a battery energy storage system (BESS) to enhance grid stability and effi

Status
Under Construction
Sector
Energy Storage, Solar, Power Generation (CCGT)
Location
Free State, South Africa
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about Notsi Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Notsi Solar Project” is an infrastructure initiative in the Energy Storage sector, located in Free State, South Africa. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Notsi solar photovoltaic project is a large-scale solar power facility with a generation capacity of 475 MWac (620 MWdc) located in the Free State, South Africa. The project spans around 1,000 hectares and includes more than 860,000 solar panels. It is planned as a standalone solar facility with future plans to integrate a battery energy storage system (BESS) to enhance grid stability and efficiency. The project has secured environmental approvals for the addition of battery storage and has achieved financial closure supported by long-term power purchase agreements with energy traders Discovery Green and NOA. Construction is assigned to a joint venture involving China Energy Engineering Corporation and the Northwest Electric Power Design Institute, with an expected construction duration of approximately 26 months. Anthem is also developing the Artemis Main Transmission Substation as part of the project, which will be transferred to Eskom later.

Original sector

Energy

Budget

Location

Country

South Africa

State

Free State

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Power Generation (CCGT)

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project