Notus Wind
Sector: Steel • Location: Ukraine
Source: International Finance Corporation (IFC)
IFC is considering a senior loan to support the construction and operation of a 120 MW wind power plant (WPP) in Odesa Oblast of Ukraine (the “Project”). The Project is developed by a special purpose vehicle (SPV, or “the Company”) established by Notus Energy GmbH (“the Sponsor”), a German-based independent renewable energy producer and contractor. More information about the Sponsor may be found a
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Wind, Cement, Road, Warehouse, Raw Materials
- Location
- Ukraine
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Notus Wind
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | IFC is considering a senior loan to support the construction and operation of a 120 MW wind power plant (WPP) in Odesa Oblast of Ukraine (the “Project”). The Project is developed by a special purpose vehicle (SPV, or “the Company”) established by Notus Energy GmbH (“the Sponsor”), a German-based independent renewable energy producer and contractor. More information about the Sponsor may be found at: www.notus.de/en. The Project consists of the development, construction, operation, and maintenance of the wind farm, which is anticipated to be operational for around 20 years. The Project will involve the installation of 21 wind turbine generators (WTGs). Each turbine has a rated capacity of 5.9 MW and a rotor diameter of 163 meters. The standard hub height is set at 125 meters. In addition to the WTGs, the Project includes the construction of internal service roads, an off-site access road, underground cable networks, an approximately 8 km 110 kV overhead transmission line, and a 110/35 kV substation. During Project construction, road construction material will be delivered from external sources, and concrete will be delivered from an offsite facility, or possibly from a mobile mixing plant within the Project area.A lenders’ environmental and social consultant (LESC) has been engaged on behalf of the Project lenders to undertake the environmental and social due diligence (ESDD). |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Location
Country | Ukraine |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Wind, Cement, Road, Warehouse, Raw Materials |
Article published date | 2026-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in Ukraine
- Chernobyl Nuclear Power Plant Decommissioning Ukraine
- Prymorska Wind Farm Zaporizhia Ukraine
- Rivne Nuclear Power Plant Ukraine
- Can-Pack (Ukraine) Ltd.
- Developing an innovative model of the cross-boeder use of zeolitic tuff
- Alchevsk Steel Combined Cycle Power Plant I Unit II
- Roads to Healthy Forests: Resilient, Adaptive, Diverse and Sustainable Forests in Cross-border Region of Ukraine and Slovakia
- Alchevsk Steel Combined Cycle Power Plant II Unit I
