logo
ProjectPending

Notus Wind

Pending · Ukraine

Source: International Finance Corporation (IFC)

IFC is considering a senior loan to support the construction and operation of a 120 MW wind power plant (WPP) in Odesa Oblast of Ukraine (the “Project”). The Project is developed by a special purpose vehicle (SPV, or “the Company”) established by Notus Energy GmbH (“the Sponsor”), a German-based independent renewable energy producer and contractor. More information about the Sponsor may be found a

Status
Prospective
Sector
Cement, Wind, Road, Power Generation (CCGT), Warehouse, Raw Materials, Steel
Location
Ukraine
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Notus Wind

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Notus Wind” is an infrastructure initiative in the Cement sector, located in Ukraine. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC is considering a senior loan to support the construction and operation of a 120 MW wind power plant (WPP) in Odesa Oblast of Ukraine (the “Project”). The Project is developed by a special purpose vehicle (SPV, or “the Company”) established by Notus Energy GmbH (“the Sponsor”), a German-based independent renewable energy producer and contractor. More information about the Sponsor may be found at: www.notus.de/en. The Project consists of the development, construction, operation, and maintenance of the wind farm, which is anticipated to be operational for around 20 years. The Project will involve the installation of 21 wind turbine generators (WTGs). Each turbine has a rated capacity of 5.9 MW and a rotor diameter of 163 meters. The standard hub height is set at 125 meters. In addition to the WTGs, the Project includes the construction of internal service roads, an off-site access road, underground cable networks, an approximately 8 km 110 kV overhead transmission line, and a 110/35 kV substation. During Project construction, road construction material will be delivered from external sources, and concrete will be delivered from an offsite facility, or possibly from a mobile mixing plant within the Project area.A lenders’ environmental and social consultant (LESC) has been engaged on behalf of the Project lenders to undertake the environmental and social due diligence (ESDD).

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

Ukraine

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Cement, Wind, Road, Power Generation (CCGT), Warehouse, Raw Materials, Steel

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project