Nova Gerar Landfill Rio de Janeiro
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The specific objectives for the Nova Gerar Landfill Gas Generation Project for Brazil will encompass maximizing the reduction of greenhouse gases and social and environmental benefits by investing in gas collection system and in a modular electricity generation plant at the landfill sites and further upgrading the waste management disposal system. The project components for both the Marambaia and
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Waste Processing and Treatment, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Nova Gerar Landfill Rio de Janeiro
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The specific objectives for the Nova Gerar Landfill Gas Generation Project for Brazil will encompass maximizing the reduction of greenhouse gases and social and environmental benefits by investing in gas collection system and in a modular electricity generation plant at the landfill sites and further upgrading the waste management disposal system. The project components for both the Marambaia and Adrian�polis sites include: Component 1) The gas collection system will use state-of-the-art technology. The landfill uses cells coated with an impermeable high-density polyethylene membrane; water residues will be channeled and treated in a waste water treatment plant. Landfill gas will be collected and channeled to the power generation units. Vertical wells will be used to extract gas. Component 2) The flares to be installed in parallel with the generator sets, will be 2000 m3/hour Modular Ground Gas Flares. Component 3) In terms of power generators, British landfill-gas-to-power company EnerG has recommended the use of modular engines, such as the Caterpillar G 3516RA Le spark ignition engines. |
Original sector | Energy and Extractives,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
