logo

Nova Scotia Municipal Electric Utility Community Solar Gardens

Sector: Solar • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
In Progress

The project consists of constructing three (3) new solar farms (solar gardens) in the towns of Antigonish, Berwick and Mahone Bay, Nova Scotia. The towns are three of five communities in Nova Scotia that own and operate their Municipal Electric Utility (MEU). The towns strive to be the first net-zero emissions communities in Canada powered by 100% renewable energy. Collectively, the towns own a mu

Status
Under Construction
Sector
Solar, Wind, Government, Power Transmission, Power Generation (CCGT)
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Nova Scotia Municipal Electric Utility Community Solar Gardens

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nova Scotia Municipal Electric Utility Community Solar Gardens” is an infrastructure initiative in the Solar sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of constructing three (3) new solar farms (solar gardens) in the towns of Antigonish, Berwick and Mahone Bay, Nova Scotia. The towns are three of five communities in Nova Scotia that own and operate their Municipal Electric Utility (MEU). The towns strive to be the first net-zero emissions communities in Canada powered by 100% renewable energy. Collectively, the towns own a municipal clean energy corporation, the Alternative Resource Energy Authority (AREA). AREA is proposing to build three community solar photovoltaic gardens to forward the net-zero emission objective. The towns of Antigonish, Berwick and Mahone Bay will own and operate the project assets installed in their respective towns. The project includes constructing three (3) new solar farms, one in each of the towns, and collectively 8.8 MW in capacity of solar PV which will produce approximately 10GWh of clean, on-peak energy within the towns’ distribution zones. The location breakdown by solar system installation is 2.1MW in the town of Antigonish, 4.8MW in the town of Berwick, and 1.9MW in the town of Mahone Bay. The project will produce energy to power 1,000 homes annually and represents 7.0% of the MEU’s total electrical energy consumption. The project will benefit the community by affordably increasing and diversifying the use of renewable energy in the towns and the Province of Nova Scotia, while providing all ratepayers with equitable access to renewable energy regardless of their housing situation (ex. own versus rent) or access to capital to install a traditional rooftop solar system. After construction of the solar gardens, the towns will produce more than 50% of their electricity needs from municipally owned clean energy sources including wind, solar and hydroelectricity. Antigonish System Size & Productivity: 2.1 MW, 2365 MWh Berwick System Size & Productivity: 4.8 MW, 5030 MWh Mahone Bay System Size & Productivity: 1.9 MW, 2216 MWh

Original sector

Green Energy

Budget

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Wind, Government, Power Transmission, Power Generation (CCGT)

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project