Novocastrian Wind Project
Cancelled · New South Wales · Last reported Aug 2025
Source: Brisbane Times
A $10 billion offshore wind farm project off the New South Wales coast between Newcastle and Port Stephens, Australia, planned to create 3000 construction jobs, but effectively killed after Equinor pulled out of the joint venture.
- Status
- Closed
- Sector
- Raw Materials, Wind
- Location
- New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Brisbane Times
ConstructChat
Ask ConstructChat about Novocastrian Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $10 billion offshore wind farm project off the New South Wales coast between Newcastle and Port Stephens, Australia, planned to create 3000 construction jobs, but effectively killed after Equinor pulled out of the joint venture. |
Original sector | Renewable Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
Source
Source | Brisbane Times |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
