Noyabrsk Combined Cycle Power Plant
Sector: Wind • Location: Russian Federation
Source: World Bank Group
In January 2007, Intertechelectro New Generation [Russian Federation] launched construction of Russia's first privately-funded power plant project. The project – a 124 MWe, 90 Gcal/hr combined-cycle gas turbine plant – was developed near Noyabrsk, in the oil-rich region of Tyumen, at an estimated cost of US$150 million. The project consisted of two 62-MWe units, each comprising a 42-MWe gas turbin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In January 2007, Intertechelectro New Generation [Russian Federation] launched construction of Russia's first privately-funded power plant project. The project – a 124 MWe, 90 Gcal/hr combined-cycle gas turbine plant – was developed near Noyabrsk, in the oil-rich region of Tyumen, at an estimated cost of US$150 million. The project consisted of two 62-MWe units, each comprising a 42-MWe gas turbine supplied by GE Energy, and a 20-MWe steam turbine supplied by Kaluga Turbines. Local engineering group ZIO supplied the heat recovery steam boilers. The plant will produce power to be sold on the wholesale electricity market, with heat to be sold to the local municipal-owned district heating company. Gazprom will supply gas from an existing trunk pipeline. The project reached financial closure in 2009. The Moscow-based, privately-owned developer has arranged a RUR2.54 billion (US$80.0 million) credit line for a period of seven years with Russia's state bank Sberbank to fund the project. A spokesman for the company said in March 2010 that the new station will enter service in Q2 2010. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
