logo

Noyabrsk Combined Cycle Power Plant

Sector: Oil and Gas • Location: Tyumen, Russian Federation

Source: World Bank Group

Project
Active

In January 2007, Intertechelectro New Generation [Russian Federation] launched construction of Russia's first privately-funded power plant project. The project – a 124 MWe, 90 Gcal/hr combined-cycle gas turbine plant – was developed near Noyabrsk, in the oil-rich region of Tyumen, at an estimated cost of US$150 million. The project consisted of two 62-MWe units, each comprising a 42-MWe gas turbin

Status
Prospective
Sector
Oil and Gas, Wind, Government, Power Generation (CCGT), Natural Gas, Manufacturing (Industrial)
Location
Tyumen, Russia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Noyabrsk Combined Cycle Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Noyabrsk Combined Cycle Power Plant” is an infrastructure initiative in the Oil and Gas sector, located in Tyumen, Russian Federation. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In January 2007, Intertechelectro New Generation [Russian Federation] launched construction of Russia's first privately-funded power plant project. The project – a 124 MWe, 90 Gcal/hr combined-cycle gas turbine plant – was developed near Noyabrsk, in the oil-rich region of Tyumen, at an estimated cost of US$150 million. The project consisted of two 62-MWe units, each comprising a 42-MWe gas turbine supplied by GE Energy, and a 20-MWe steam turbine supplied by Kaluga Turbines. Local engineering group ZIO supplied the heat recovery steam boilers. The plant will produce power to be sold on the wholesale electricity market, with heat to be sold to the local municipal-owned district heating company. Gazprom will supply gas from an existing trunk pipeline. The project reached financial closure in 2009. The Moscow-based, privately-owned developer has arranged a RUR2.54 billion (US$80.0 million) credit line for a period of seven years with Russia's state bank Sberbank to fund the project. A spokesman for the company said in March 2010 that the new station will enter service in Q2 2010.

Original sector

Energy

Budget

Location

Country

Russia

State

Tyumen

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Wind, Government, Power Generation (CCGT), Natural Gas, Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project