NPPWD Wellhouse 7 Construction
Sector: Water Supply and Storage • Location: Machesney Park, Illinois, United States of America
Source: Dodge USA
The scope of this project involves the construction of high-capacity public water supply well, Well No. 7. The well is estimated to be 250-feet in depth, with a 24 inch steel casing and 18 inch stainless steel well screen. The target yield for Well No. 7 is 4,000 gpm. A pilot hole is to be drilled first to confirm the suitability of the geology before construction of Well No. 7. Construction of We
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Car parking, Automotive, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Machesney Park, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NPPWD Wellhouse 7 Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this project involves the construction of high-capacity public water supply well, Well No. 7. The well is estimated to be 250-feet in depth, with a 24 inch steel casing and 18 inch stainless steel well screen. The target yield for Well No. 7 is 4,000 gpm. A pilot hole is to be drilled first to confirm the suitability of the geology before construction of Well No. 7. Construction of Wellhouse 7 (Bid 24-2350), which includes construction a drinking water well (Well 7), a pumping fa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Machesney Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Car parking, Automotive, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
