logo
ProjectPre-Design

NPS / Farrell Lane Sewer Line Replacement

Pre-design · Virginia · Last reported Apr 2024

Source: Dodge USA

A gravity flow sanitary sewer line located on National Park Service property east of Lafayette Boulevard. This line flows north approximately parallel to Lafayette Boulevard from the south City limits toward and eventually into the Hazel Run Interceptor Sewer nearthe Blue and Gray Parkway. construction is estimated to begin in FY 2029. The construction estimate may be revised based on the design p

Status
Prospective
Sector
Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
Location
Fredericksburg, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NPS / Farrell Lane Sewer Line Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NPS / Farrell Lane Sewer Line Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Fredericksburg, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A gravity flow sanitary sewer line located on National Park Service property east of Lafayette Boulevard. This line flows north approximately parallel to Lafayette Boulevard from the south City limits toward and eventually into the Hazel Run Interceptor Sewer nearthe Blue and Gray Parkway. construction is estimated to begin in FY 2029. The construction estimate may be revised based on the design process.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Fredericksburg

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project