NROCC 19 Millstone RD
Open · Massachusetts
Source: City of Boston
Confirming occupancy of a 1 family home.; Remove tile floor in downstairs hallway and kitchen. Remove vinyl flooring upstairs. Install hardwood flooring downstairs hallway and kitchen and upstairs. Repair front and back porches. Replace broken windows. Paint entire house.; Power siding of house.6/29/23 Recently re-assigned by Supervisor to FD
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Residential, Government
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about NROCC 19 Millstone RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Confirming occupancy of a 1 family home.; Remove tile floor in downstairs hallway and kitchen. Remove vinyl flooring upstairs. Install hardwood flooring downstairs hallway and kitchen and upstairs. Repair front and back porches. Replace broken windows. Paint entire house.; Power siding of house.6/29/23 Recently re-assigned by Supervisor to FD |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Residential, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
