NROCC 94 Sydney ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Confirm occupancy as a single family home. Basement Renovation. Build playroom, bathroom, workshop, laundry room in basement. Install wood studs where needed, drywall, insulate walls. Repair damaged stairs from 1st flr to basement. Repair damaged stairs at bulkhead door area. Repair existing concrete floor with new concrete slab on grade.
- Status
- Prospective
- Sector
- Residential, Cement, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about NROCC 94 Sydney ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Confirm occupancy as a single family home. Basement Renovation. Build playroom, bathroom, workshop, laundry room in basement. Install wood studs where needed, drywall, insulate walls. Repair damaged stairs from 1st flr to basement. Repair damaged stairs at bulkhead door area. Repair existing concrete floor with new concrete slab on grade. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
