NRSS XXIX Transmission Lines
Sector: Commercial • Location: Punjab, India
Source: World Bank Group
The project entails the construction of a 425 Km long 400 kV transmission line between Jalandhar, Samba and Amargarh, a LILO of both circuits of Uri-Wagoora 400 kV line at Amargarh (on multi circuit towers), and the establishment of a 7x105 MVA with 400/220 kV GIS substation at Amargarh, India. This Northern Region Strengthening Scheme project (NRSS 29) is a part of the National Grid and is design
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Punjab, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NRSS XXIX Transmission Lines
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a 425 Km long 400 kV transmission line between Jalandhar, Samba and Amargarh, a LILO of both circuits of Uri-Wagoora 400 kV line at Amargarh (on multi circuit towers), and the establishment of a 7x105 MVA with 400/220 kV GIS substation at Amargarh, India. This Northern Region Strengthening Scheme project (NRSS 29) is a part of the National Grid and is designed to carry over 1000 MWs of electricity from Punjab to the Kashmir Valley. The project company is NRSS XXIX Transmission Pvt Ltd and sponsor is Sterlite Grid 2, a Sterlite Technologies company. Sterlite Grid Ltd was awarded the ultra- mega transmission project (UMTP) on build-own-operate basis by the Ministry of Power, following a process of competitive tendering wherein Sterlite Grid emerged as the lowest bidder quoting an annual tariff of about INR 4.4 billion which was 5 per cent lower than the next highest bid. The total project cost is $447.2 million (INR 30 billion). Financing comprises a $335.5 million 21-year term loan and a $111.8 million equity. Lenders are SBI, OBC, Punjab National Bank, India Infrastructure Finance and PTC India Financial Services. Financial close occurred on 30 May 2016. Financing information from Dealogic http://articles.economictimes.indiatimes.com/2014-05-26/news/50099259_1_kashmir-valley-umtp-transmission http://www.spml.co.in/mediaroom/2014/Electrical-Monitor-May-2014.pdf http://www.sterlitegrid.com/sprojects/nrss-xxix-transmission-limited/ http://www.rectpcl.com/index.php?option=com_content&view=article&id=141&Itemid=241 http://cea.nic.in/reports/committee/scm/nr/minutes_meeting/38th.pdf |
Original sector | Energy |
Budget |
Location
Country | India |
State | Punjab |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2024-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
