logo

NRSS XXIX Transmission Lines

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

The project entails the construction of a 425 Km long 400 kV transmission line between Jalandhar, Samba and Amargarh, a LILO of both circuits of Uri-Wagoora 400 kV line at Amargarh (on multi circuit towers), and the establishment of a 7x105 MVA with 400/220 kV GIS substation at Amargarh, India. This Northern Region Strengthening Scheme project (NRSS 29) is a part of the National Grid and is design

Project Information FAQ

Project Information

5 Q
The project “NRSS XXIX Transmission Lines” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction of a 425 Km long 400 kV transmission line between Jalandhar, Samba and Amargarh, a LILO of both circuits of Uri-Wagoora 400 kV line at Amargarh (on multi circuit towers), and the establishment of a 7x105 MVA with 400/220 kV GIS substation at Amargarh, India. This Northern Region Strengthening Scheme project (NRSS 29) is a part of the National Grid and is designed to carry over 1000 MWs of electricity from Punjab to the Kashmir Valley. The project company is NRSS XXIX Transmission Pvt Ltd and sponsor is Sterlite Grid 2, a Sterlite Technologies company. Sterlite Grid Ltd was awarded the ultra- mega transmission project (UMTP) on build-own-operate basis by the Ministry of Power, following a process of competitive tendering wherein Sterlite Grid emerged as the lowest bidder quoting an annual tariff of about INR 4.4 billion which was 5 per cent lower than the next highest bid. The total project cost is $447.2 million (INR 30 billion). Financing comprises a $335.5 million 21-year term loan and a $111.8 million equity. Lenders are SBI, OBC, Punjab National Bank, India Infrastructure Finance and PTC India Financial Services. Financial close occurred on 30 May 2016. Financing information from Dealogic http://articles.economictimes.indiatimes.com/2014-05-26/news/50099259_1_kashmir-valley-umtp-transmission http://www.spml.co.in/mediaroom/2014/Electrical-Monitor-May-2014.pdf http://www.sterlitegrid.com/sprojects/nrss-xxix-transmission-limited/ http://www.rectpcl.com/index.php?option=com_content&view=article&id=141&Itemid=241 http://cea.nic.in/reports/committee/scm/nr/minutes_meeting/38th.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data