NS Bridge Replacement MP 151.4W Mount Carmel IL
Sector: Bridge • Location: Mount Carmel, Illinois, United States of America
Source: Dodge
Fabricate, erect and install 1,008,000lbs of steel comprised of 2 TPG spans and 1 DPG span Modify the existing truss span pier to accommodate 2 TPG spans Fabricate, erect, and install new bearings and riser blocks for the 3 spans Remove and dispose of the existing 232 foot long swing truss and 50 long beam span, both believed to contain lead paint
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction documents |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Fabricate, erect and install 1,008,000lbs of steel comprised of 2 TPG spans and 1 DPG span Modify the existing truss span pier to accommodate 2 TPG spans Fabricate, erect, and install new bearings and riser blocks for the 3 spans Remove and dispose of the existing 232 foot long swing truss and 50 long beam span, both believed to contain lead paint |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
