logo
ProjectConstruction Documents

NS Bridge Replacement MP 91.30-H Silver Creek GA

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Excavation and placement of controlled low strength material mat underneath the existing steel trestle. Installation of eight lines of 6 -6 x 4 -9 precast concrete box culverts (B1 through B3) underneath the trestle. Construction of associated cast-in-place concrete inlet/outlet walls and wingwall facing. Removal and disposal of the steel ballast pan and stringers. Temporary removal and restoratio

Status
Closed
Sector
Steel, Bridge, Cement, Rail, Commercial, Metal
Location
Silver Creek, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NS Bridge Replacement MP 91.30-H Silver Creek GA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NS Bridge Replacement MP 91.30-H Silver Creek GA” is an infrastructure initiative in the Steel sector, located in Silver Creek, Georgia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Excavation and placement of controlled low strength material mat underneath the existing steel trestle. Installation of eight lines of 6 -6 x 4 -9 precast concrete box culverts (B1 through B3) underneath the trestle. Construction of associated cast-in-place concrete inlet/outlet walls and wingwall facing. Removal and disposal of the steel ballast pan and stringers. Temporary removal and restoration of ballast and track as shown.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Silver Creek

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Bridge, Cement, Rail, Commercial, Metal

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project