NS Enola 3rd Mainline Civil/Structural Construction
Sector: Tunnel • Location: Marysville, Pennsylvania, United States of America
Source: Dodge
clearing and grubbing of 18.3 AC - 44,642 CY of unclassified excavation (includes 5,182 CY of Unsuitable material for offsite disposal) - installation of 24,700 TN of NS type BDGA - installation of 44,400 TN of 4 inch minus - asphalt/crossing/traffic control work for Burley and Railroad St crossings - railroad bridge replacement and raise - tunnel extension - railroad bridge structural removal - i
- Status
- Closed
- Sector
- Tunnel, Mass Transit, Road, Steel, Rail, Bridge, Commercial, Metal
- Location
- Marysville, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NS Enola 3rd Mainline Civil/Structural Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | clearing and grubbing of 18.3 AC - 44,642 CY of unclassified excavation (includes 5,182 CY of Unsuitable material for offsite disposal) - installation of 24,700 TN of NS type BDGA - installation of 44,400 TN of 4 inch minus - asphalt/crossing/traffic control work for Burley and Railroad St crossings - railroad bridge replacement and raise - tunnel extension - railroad bridge structural removal - installation of soldier pile wall - culvert replacements - 100 lf of 72" steel pipe - 84 lf of 72"... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Marysville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Tunnel, Mass Transit, Road, Steel, Rail, Bridge, Commercial, Metal |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
