NSBU Water Treatment Plant Renovation
Closed · Florida · Last reported Aug 2025
Source: Dodge
contractor s bid shall be based on actual field measurements. All work will follow applicable building codes, regulations and ADA Compliance. Scope overview: 1. Remove and replace breakroom, restroom and control room 4 x 2 grid ceilings with new 2 x 2 grid ceilings. 2. Install new LED light fixtures. 3. Install new HVAC diffusers, returns and exhaust fans. 4. Remove and replace urinal, toilets, la
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Government, Waste Processing and Treatment, Commercial
- Location
- New Smyrna Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NSBU Water Treatment Plant Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | contractor s bid shall be based on actual field measurements. All work will follow applicable building codes, regulations and ADA Compliance. Scope overview: 1. Remove and replace breakroom, restroom and control room 4 x 2 grid ceilings with new 2 x 2 grid ceilings. 2. Install new LED light fixtures. 3. Install new HVAC diffusers, returns and exhaust fans. 4. Remove and replace urinal, toilets, lavatories, partitions, mirrors, soap dispensers and toilet paper dispensers. 5. Replace all water ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | New Smyrna Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
