NSD - Pre-Engineered Metal Building Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The scope of work: Includes the construction of a pre-engineered metal building PEMB, providing new shops, restrooms and offices to support the career and technical education CTE program for NSD. Project consists of the PEMB building, drive entrance, accessible route to existing school, and bid alternates as listed under section 01 23 00.
- Status
- Prospective
- Sector
- Metal, Education, Government, Residential, Road, Commercial
- Location
- Nespelem, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NSD - Pre-Engineered Metal Building Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work: Includes the construction of a pre-engineered metal building PEMB, providing new shops, restrooms and offices to support the career and technical education CTE program for NSD. Project consists of the PEMB building, drive entrance, accessible route to existing school, and bid alternates as listed under section 01 23 00. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Nespelem |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Government, Residential, Road, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
