In 2005, NSL Renewable Power Private Limited (NRPPL), through its subsidiary NSL Wind Power Company (Phoolwadi) Private Limited,entered into an agreement with Tamilnadu Government, to develop a 49.5 MW wind power project in Phoolwadi, in Tirupur district of Tamilnadu. The project would be executed in 2 phases - Phase-I of 30MW, and Phase-II of 19.5MW. The wind farm involved the building of 33 ReGe

Project Information FAQ

Project Information

5 Q
The project “NSL Wind Power Company (Phoolwadi) Private Limited” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2005, NSL Renewable Power Private Limited (NRPPL), through its subsidiary NSL Wind Power Company (Phoolwadi) Private Limited,entered into an agreement with Tamilnadu Government, to develop a 49.5 MW wind power project in Phoolwadi, in Tirupur district of Tamilnadu. The project would be executed in 2 phases - Phase-I of 30MW, and Phase-II of 19.5MW. The wind farm involved the building of 33 ReGen V82 wind turbines of 1500KW capacity each.. The farm was expected to have a load factor of 27.5%. The electricity generated from the project would be evacuated by the Tamilnadu state electricity grid. The EPC for the power plant had been awarded to ReGen Powertech in October 2010. ReGen Powertech would develop,construct,commission operate and maintain the project at an all-inclusive price. As per the agreement signed, ReGen would acquire the entire land required for the project and transfer the development rights to the company prior to commencement of operations. ReGen Powertech had received all the statutory and non-statutory clearances necessary for the project. NSL Phoolwadi Wind Farm had entered into an blanket O&M agreement with the WEG supplier ReGen for operating and maintaining WECs for the life of the project. Please note that NSL Group was the promoter of Regen Powertech Private Limited. NSL Wind Power Company (Phoolwadi) Private Limited had entered into PPA agreement with various industries in that belt under "Group Captive" Power Plant Policy in Tamil Nadu. The industrial /commercial consumers would have at least 26% equity stake in the company and would consume at least 51% of the power produced.The details of the pricing with these industrial consumers couldnt be ascertained at the time of collection of this information. However, the APPC (Average Power Purchase Cost) 20-year base feed-in tariff as per TNRC (Tamil Nadu State Regulator) prevailing tariff order, was US$ 0.066/Unit (INR 3.51 per unit @ 53.44INR/USD). The transmission charges would be paid by NSL Phoolwadi Wind Farm to the state transmission utility. The total capacity of 49.5MW was eligible for GBI as well as CDM benefits and the company had initiated the process with UNFCC. Financial closure took place on 22nd June 2012.The total project cost at the time of financial closure was US$ 49.4mn (INR 2640mn @53.44 INR/USD).The debt equity ratio for the project was 57/43. Financing comprised a 12-year 6-months term loan of US$ 28.1mn (INR 1500mn) and sponsor equity of US$ 21.3mn (INR 1140mn). The term loan had a repayment schedule of 50 quarterly installments. IDFC Bank was the mandated lead arranger. Phase-I of the project was expected to be commissioned by 31/08/2011 and Phase-II was expected to be commissioned by 30/09/2011. The company achieved month-wise commercial operation of wind turbine generators starting from July 2011. As per the company information, both phases of the project had been commissioned in 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data