logo
ProjectCompleted

NSL Wind

Completed · India

Source: International Finance Corporation (IFC)

NSL Renewable Power Private Limited (NRPPL), an existing IFC investee company (# 29912), is a subsidiary of NSL Group established for implementation of renewable power projects across the country. NRPPL intends to set up a wind power project of 75 MW in Chilarwadi village of Man Tehsil, Satara District of Maharashtra, India (the “Project”) through a subsidiary NSL Wind Power Company (Satara) Priva

Status
Closed
Sector
Wind, Government, Power Generation (CCGT)
Location
India
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about NSL Wind

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NSL Wind” is an infrastructure initiative in the Wind sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

NSL Renewable Power Private Limited (NRPPL), an existing IFC investee company (# 29912), is a subsidiary of NSL Group established for implementation of renewable power projects across the country. NRPPL intends to set up a wind power project of 75 MW in Chilarwadi village of Man Tehsil, Satara District of Maharashtra, India (the “Project”) through a subsidiary NSL Wind Power Company (Satara) Private Limited (“NSL Wind” or the “Company”). The Project will be implemented in two phases with 25.5 MW to be implemented in the first phase. Construction period for each phase is expected to be 6 months from start of construction. IFC is considering providing a loan to NSL Wind to part finance the Project.The Project involves supply, erection, testing, commissioning, operation and maintenance of 50 wind turbines, with a unit generating capacity of 1.5MW to be supplied by ReGen under a supply, erection and commissioning contract with NSL Wind. Further, ReGen is also the O&M operator of this Project under an O&M contract with the Company. Transformers will be located near the turbine within an access controlled area. Underground cables will connect each turbine-transformer and overhead conductor will connect the transformer to the pooling substation. ReGen has constructed a 220 kV Transmission Line from Pooling Substation to the Maharashtra State Electricity Transmission Company Limited (MSETCL), the state transmission utility’s interconnection point. The pooling sub-station, 220 kV T-Line and monitoring station will be shared with ReGen’s other existing and future projects for other project owners.

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

India

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Wind, Government, Power Generation (CCGT)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project