NT Solar Energy Transformation Program
Sector: Energy Storage • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
The NT Solar Energy Transformation Program (SETuP) has transformed the delivery of electricity in remote off-grid communities throughout the Northern Territory.Project innovationThe NT Solar Energy Transformation Program deployed medium and high penetration renewable energy systems to 26 remote communities in the Northern Territory.Delivered through Power and Water’s subsidiary Indigenous Essentia
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The NT Solar Energy Transformation Program (SETuP) has transformed the delivery of electricity in remote off-grid communities throughout the Northern Territory.Project innovationThe NT Solar Energy Transformation Program deployed medium and high penetration renewable energy systems to 26 remote communities in the Northern Territory.Delivered through Power and Water’s subsidiary Indigenous Essential Services Pty Ltd, the project integrated 10 MW of solar photovoltaic (PV) with existing diesel power stations in remote locations without compromising power quality and reliability.The majority of system installations, totalling 9 MW, were designed to achieve 15 per cent diesel fuel displacement. A 1 MW high penetration system was installed at Daly River (Nauiyu), achieving about 50 per cent diesel fuel displacement.The project demonstrated integration technologies such as energy storage, flexible diesel technology, advanced control systems and cloud forecasting. These advancements can be rolled out to the other sites in this project as each technology becomes viable.SETuP was designed to create a platform for greater use of renewable energy in communities in the future.The outcomes at Daly River will guide deployment of enabling technologies in other remote communities served by Power and Water as they become cost effective. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Energy Storage projects in Australia
- Kidston Pumped Storage Hydro Project Queensland Australia
- Wambo Wind Farm Australia
- Western Downs Green Power Hub Queensland
- Sapphire Windfarm New South Wales
- Wellington North Solar Project New South Wales Australia
- Energy Freedom Solar Electric Vehicle Pilot
- Kidston Pumped Hydro Energy Storage
- AGL Broken Hill Grid-Forming Battery
