NTPC 100 MW Solar Unit at Ramagundam
Sector: Geothermal • Location: Ramagundam, India
Source: Power Peak Digest
NTPC Limited has declared commercial operation of 100 MW from its Ramagundam solar project effective May 2, 2026. The unit is part of a 176 MW project. With this addition, NTPC group’s installed capacity has reached 89,805 MW and commercial capacity 88,725 MW. The project contributes to NTPC’s renewable energy expansion and supports diversification beyond thermal generation.
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT), Solar, Commercial
- Location
- Ramagundam, India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about NTPC 100 MW Solar Unit at Ramagundam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTPC Limited has declared commercial operation of 100 MW from its Ramagundam solar project effective May 2, 2026. The unit is part of a 176 MW project. With this addition, NTPC group’s installed capacity has reached 89,805 MW and commercial capacity 88,725 MW. The project contributes to NTPC’s renewable energy expansion and supports diversification beyond thermal generation. |
Original sector | Power |
Location
Country | India |
City | Ramagundam |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Solar, Commercial |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
