logo

NTPC Barh Super Thermal Power Project Unit-3 Trial Run

Sector: Geothermal • Location: Barh, Bihar, India

Source: Fortune India

Project
Trial Run Completed

NTPC has successfully completed the trial run of Unit-3 (660 MW) of the Barh Super Thermal Power Project, Stage-1 (3x660 MW).

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT)
Location
Barh, Bihar, India
Updated
22 Jul 2026
Source
Fortune India

ConstructChat

Ask ConstructChat about NTPC Barh Super Thermal Power Project Unit-3 Trial Run

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “NTPC Barh Super Thermal Power Project Unit-3 Trial Run” is an infrastructure initiative in the Geothermal sector, located in Barh, Bihar, India. Taiyo aggregates data on it from Fortune India.

Participants

Not available for this record.

Status

Original status

trial run completed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

NTPC has successfully completed the trial run of Unit-3 (660 MW) of the Barh Super Thermal Power Project, Stage-1 (3x660 MW).

Original sector

Energy

Location

Country

India

State

Bihar

City

Barh

Source

Source

Fortune India

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT)

Article published date

2025-06-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project