NTPC Battery Energy Storage System EPC Project
The owner, status and timeline of this project. A free account opens every field.
Source: HDFC Sky
G R Infraprojects Limited has secured a ₹413.37 crore EPC contract from NTPC Limited for a Battery Energy Storage System project at NTPC's Mouda Super Thermal Power Station. The project includes full EPC scope and long-term maintenance over the system's lifecycle, to be executed over 15 months.
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Geothermal
- Location
- Mouda, India
- Updated
- 22 Jul 2026
- Source
- HDFC Sky
ConstructChat
Ask ConstructChat about NTPC Battery Energy Storage System EPC Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | G R Infraprojects Limited has secured a ₹413.37 crore EPC contract from NTPC Limited for a Battery Energy Storage System project at NTPC's Mouda Super Thermal Power Station. The project includes full EPC scope and long-term maintenance over the system's lifecycle, to be executed over 15 months. |
Original sector | Energy |
Budget |
Location
Country | India |
City | Mouda |
Source
Source | HDFC Sky |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Geothermal |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
