NTPC Meja Thermal Power Plant Expansion Phase 2
Sector: Geothermal • Location: India
Source: Bitget
The second phase of the Meja thermal power plant expansion, which would add two 660 MW units, has not commenced since its proposal in 2014 due to unresolved fuel logistics, despite having regulatory approvals.
- Status
- Prospective
- Sector
- Geothermal, Warehouse, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Bitget
ConstructChat
Ask ConstructChat about NTPC Meja Thermal Power Plant Expansion Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned but stalled |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase of the Meja thermal power plant expansion, which would add two 660 MW units, has not commenced since its proposal in 2014 due to unresolved fuel logistics, despite having regulatory approvals. |
Original sector | Energy |
Location
Country | India |
Source
Source | Bitget |
URL |
More Details
Record type | Project |
Sector | Geothermal, Warehouse, Power Generation (CCGT) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
