logo

Nubia West Minya

Sector: Geothermal • Location: Egypt

Source: European Bank for Reconstruction and Development (EBRD)

Project
Passed Concept Review, Pending Final Review

A senior secured loan on a non-recourse basis in favour of Nefer Menya for Renewable Energy owned by Infinity Power Holding (51%) and HAU Energy (49%), to finance the development, construction, commissioning, operation and maintenance of a 1 GW solar photovoltaic (“PV”) facility coupled with a 600 MWh battery energy storage system (“BESS”) located in West Minya, Egypt (the “Project”). The Project

Project Information FAQ

Project Information

4 Q
The project “Nubia West Minya” is an infrastructure initiative in the Geothermal sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

passed concept review, pending final review

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A senior secured loan on a non-recourse basis in favour of Nefer Menya for Renewable Energy owned by Infinity Power Holding (51%) and HAU Energy (49%), to finance the development, construction, commissioning, operation and maintenance of a 1 GW solar photovoltaic (“PV”) facility coupled with a 600 MWh battery energy storage system (“BESS”) located in West Minya, Egypt (the “Project”). The Project will be one of the first large-scale renewable developments in Egypt to integrate a BESS component, marking a significant milestone for the sector. The Project will help address Egypt’s current energy shortfall, at a time when renewable energy has become increasingly essential not only for decarbonisation, but also to reduce costly LNG imports and alleviate pressure on FX reserves. The Project is expected to result in significant environmental benefits through the introduction of 1 GW of new solar capacity corresponding to yearly reduction of more than 1.2 million tonnes of CO2 emissions. The integrated BESS will also enhance grid stability by shifting excess solar generation and providing balancing services at times of peak demand. Download zip package in English Download zip package in Arabic Full ESIA documentation is available locally at: 1. Governorate-level government buildings (Minya City) 2. Markaz / city-level government buildings (closest to the site) 3. Public spaces 4. NGOs And EBRD Resident Office: EGID Building, First Floor, Block 72, 5th Settlement New Cairo, Cairo, Egypt. Contact name: Merriam Fahmy Telephone: +20 1200034064 And https://weareinfinitypower.com/images/PDF/neferminya.zip Environmental or social enquiries Aly Khalifa Aly.Khalifa@hassanallam.com Hassan Allam Head Office, +202 2265 9000, 5 Anqara, Sheraton Housing, Heliopolis, Cairo, Egypt www.hassanallam.com info@hassanallam.com Eman Adel eman.adel@weareinfinitypower.com Infinity Power Head Office, +20225258960 57 Nile Corniche St., El Maadi 11431, Cairo, Egypt https://weareinfinitypower.com/ info@weareinfinitypower.com As above.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data