Nubia West Minya
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
A senior secured loan on a non-recourse basis in favour of Nefer Menya for Renewable Energy owned by Infinity Power Holding (51%) and HAU Energy (49%), to finance the development, construction, commissioning, operation and maintenance of a 1 GW solar photovoltaic (“PV”) facility coupled with a 600 MWh battery energy storage system (“BESS”) located in West Minya, Egypt (the “Project”). The Project
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Hydro, LNG, Warehouse, Solar, Raw Materials, Residential, Wind, Manufacturing (Industrial), Energy Storage, Power Generation (CCGT), Commercial, Geothermal, Government
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Nubia West Minya
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | passed final review, pending approval |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A senior secured loan on a non-recourse basis in favour of Nefer Menya for Renewable Energy owned by Infinity Power Holding (51%) and HAU Energy (49%), to finance the development, construction, commissioning, operation and maintenance of a 1 GW solar photovoltaic (“PV”) facility coupled with a 600 MWh battery energy storage system (“BESS”) located in West Minya, Egypt (the “Project”). The Project will be one of the first large-scale renewable developments in Egypt to integrate a BESS component, marking a significant milestone for the sector. The Project will help address Egypt’s current energy shortfall, at a time when renewable energy has become increasingly essential not only for decarbonisation, but also to reduce costly LNG imports and alleviate pressure on FX reserves. The Project is expected to result in significant environmental benefits through the introduction of 1 GW of new solar capacity corresponding to yearly reduction of more than 1.2 million tonnes of CO2 emissions. The integrated BESS will also enhance grid stability by shifting excess solar generation and providing balancing services at times of peak demand. Download zip package in English Download zip package in Arabic Full ESIA documentation is available locally at: 1. Governorate-level government buildings (Minya City) 2. Markaz / city-level government buildings (closest to the site) 3. Public spaces 4. NGOs And EBRD Resident Office: EGID Building, First Floor, Block 72, 5th Settlement New Cairo, Cairo, Egypt. Contact name: Merriam Fahmy Telephone: +20 1200034064 And https://weareinfinitypower.com/images/PDF/neferminya.zip Environmental or social enquiries Aly Khalifa Aly.Khalifa@hassanallam.com Hassan Allam Head Office, +202 2265 9000, 5 Anqara, Sheraton Housing, Heliopolis, Cairo, Egypt www.hassanallam.com info@hassanallam.com Eman Adel eman.adel@weareinfinitypower.com Infinity Power Head Office, +20225258960 57 Nile Corniche St., El Maadi 11431, Cairo, Egypt https://weareinfinitypower.com/ info@weareinfinitypower.com As above. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Hydro, LNG, Warehouse, Solar, Raw Materials, Residential, Wind, Manufacturing (Industrial), Energy Storage, Power Generation (CCGT), Commercial, Geothermal, Government |
Article published date | 2026-08-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
