Nuclear-Powered Submarine Development Project
Basic design phase · Gyeongsangnam-do · Last reported Dec 2026
Source: 아시아경제
Hanwha Ocean plans to complete the basic design phase for the nuclear-powered submarine development project within 2026. The project involves conceptual design, basic design, detailed design, and construction of the first nuclear submarine vessel domestically in the Republic of Korea. The construction is expected to take place at Hanwha Ocean Geoje Shipyard, with the first submarine launch planned
- Status
- Prospective
- Sector
- Power Generation (CCGT), Aerospace & Defense, Government, Nuclear, Seaport
- Location
- Geoje, Gyeongsangnam-do, South Korea
- Updated
- 22 Jul 2026
- Source
- 아시아경제
ConstructChat
Ask ConstructChat about Nuclear-Powered Submarine Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | basic design phase |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hanwha Ocean plans to complete the basic design phase for the nuclear-powered submarine development project within 2026. The project involves conceptual design, basic design, detailed design, and construction of the first nuclear submarine vessel domestically in the Republic of Korea. The construction is expected to take place at Hanwha Ocean Geoje Shipyard, with the first submarine launch planned for the mid-2030s and operational by the late 2030s. The project includes development of a small reactor for the submarine, led by the Agency for Defense Development with participation from Doosan Enerbility, Korea Atomic Energy Research Institute, and Korea Electric Power Corporation. |
Original sector | Defense |
Location
Country | South Korea |
State | Gyeongsangnam-do |
City | Geoje |
Source
Source | 아시아경제 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Aerospace & Defense, Government, Nuclear, Seaport |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
