Nuclear Waste Treatment Facility Quality Control Settlement
Sector: Metal • Location: Aiken, South Carolina, United States
Source: Department of Justice
Energy & Process Corporation has agreed to pay $4.6 million to resolve allegations of false claims regarding defective steel rebar and quality control failures in the construction of a Department of Energy nuclear waste treatment facility. The company allegedly failed to perform required quality assurance procedures and falsely certified compliance with contract requirements.
- Status
- Closed
- Sector
- Metal, Steel, Nuclear
- Location
- Aiken, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Department of Justice
ConstructChat
Ask ConstructChat about Nuclear Waste Treatment Facility Quality Control Settlement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energy & Process Corporation has agreed to pay $4.6 million to resolve allegations of false claims regarding defective steel rebar and quality control failures in the construction of a Department of Energy nuclear waste treatment facility. The company allegedly failed to perform required quality assurance procedures and falsely certified compliance with contract requirements. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Aiken |
Source
Source | Department of Justice |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Nuclear |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
