Nuevo Area Rehabilitation
Sector: Car parking • Location: California, United States of America
Source: Riverside County
Limits: Varies, see below Length: Approximately 7,800 feet District: 5 Community: Nuevo
The County of Riverside Transportation Department proposes to rehabilitate the following roads in the Nuevo Area. The roads are all classified as being Local Roads in the County of Riverside General Plan. The roads range from 28-44 feet wide with curb/gutter and sidewalk. The proposed improvements consist of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: Varies, see below Length: Approximately 7,800 feet District: 5 Community: Nuevo The County of Riverside Transportation Department proposes to rehabilitate the following roads in the Nuevo Area. The roads are all classified as being Local Roads in the County of Riverside General Plan. The roads range from 28-44 feet wide with curb/gutter and sidewalk. The proposed improvements consist of removing the existing roadway, cement treating the base, and overlaying Hot Mix Asphalt (HMA). Porter Street from Menifee Road to Approximately 1,000 feet West of Penasco Circle Mirileste Drive from Menifee Road to Approximately 200 feet West of Pasito Street Via Santana from 150 ft Notth of Mirileste Drive to Approximately 200 feet South of Pablo Street Penasco Circle from Porter Street to Approximately 800 feet South of Mecheka Drive Macheka Drive from Mirileste Drive to Penasco Circle Pasito Street from Mirileste Drive to Approximately 500 feet East of Mirileste Drive Pablo Street from Via Santana to Approximately 200 feet east of Via Santana Additional improvements include: Reconstruction of concrete sidewalk, curb/gutter, driveway approach, cross gutter, and spandrel Placement of safety edge and shoulder backing Utility adjustments Striping of roadway, including pavement markers and reflectors No additional right-of-way or temporary construction easements will be required to construct the proposed improvement. The project improvements will not raise the existing roadway profiles. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
