Nura River Clean-Up Project
Closed · Kazakhstan
Source: World Bank Group
The development objective of the Nura River Cleanup Project for Kazakhstan is to improve the welfare of the population in the Nura River Basin by cleaning up serious mercury pollution in and adjacent to the Nura River, providing a safe, secure, and cost-effective alternative source of water supply to meet growing needs of local water users, and restoring flow control in the river for flood managme
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Nura River Clean-Up Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Nura River Cleanup Project for Kazakhstan is to improve the welfare of the population in the Nura River Basin by cleaning up serious mercury pollution in and adjacent to the Nura River, providing a safe, secure, and cost-effective alternative source of water supply to meet growing needs of local water users, and restoring flow control in the river for flood managmement and ecological purposes. There are four project components. The first includes financing to 1) construct a secure landfill for proper containment of contaminated soil and materials; 2) excavate contaminated hotspots at the AO Karbide plant site at Temirtau (factory building, main drain, and adjacent waste disposal sites); and 3) excavate other highly contaminated areas including the Zhaur Swamp, and critical areas of mercury accumulation along the banks and floodplains of the Nura River, as well as the transport of the materials to the landfill site. Component 2 finances rehabilitation of the Intumak Reservoir, including reinforcement of the dam and completion of the spillway and gates to allow the dam to operate as a mechanism for flow control at its original design reservoir level. Component 3 finances technical assistance, training, and equipment needed to increase the institutional capacity of the Nura-Sarysu River Basin Authority, in order to strengthen its resource planning and management capacity, as well as to strengthen the water quality monitoring network, and water pollution control systems. Component 4 covers a number of activities related to project management and monitoring, including providing training in areas such as procurement, disbursement, and project accounting; auditing project accounts; assisting in implementing the environmental management plan, especially in regard to public awareness; and specialist assistance in areas such as hydrology, social sciences, and environmental management. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Kazakhstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
