logo
ProjectClosed

Nura River Clean-Up Project

Closed · Kazakhstan

Source: World Bank Group

The development objective of the Nura River Cleanup Project for Kazakhstan is to improve the welfare of the population in the Nura River Basin by cleaning up serious mercury pollution in and adjacent to the Nura River, providing a safe, secure, and cost-effective alternative source of water supply to meet growing needs of local water users, and restoring flow control in the river for flood managme

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial
Location
Kazakhstan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Nura River Clean-Up Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nura River Clean-Up Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Nura River Cleanup Project for Kazakhstan is to improve the welfare of the population in the Nura River Basin by cleaning up serious mercury pollution in and adjacent to the Nura River, providing a safe, secure, and cost-effective alternative source of water supply to meet growing needs of local water users, and restoring flow control in the river for flood managmement and ecological purposes. There are four project components. The first includes financing to 1) construct a secure landfill for proper containment of contaminated soil and materials; 2) excavate contaminated hotspots at the AO Karbide plant site at Temirtau (factory building, main drain, and adjacent waste disposal sites); and 3) excavate other highly contaminated areas including the Zhaur Swamp, and critical areas of mercury accumulation along the banks and floodplains of the Nura River, as well as the transport of the materials to the landfill site. Component 2 finances rehabilitation of the Intumak Reservoir, including reinforcement of the dam and completion of the spillway and gates to allow the dam to operate as a mechanism for flow control at its original design reservoir level. Component 3 finances technical assistance, training, and equipment needed to increase the institutional capacity of the Nura-Sarysu River Basin Authority, in order to strengthen its resource planning and management capacity, as well as to strengthen the water quality monitoring network, and water pollution control systems. Component 4 covers a number of activities related to project management and monitoring, including providing training in areas such as procurement, disbursement, and project accounting; auditing project accounts; assisting in implementing the environmental management plan, especially in regard to public awareness; and specialist assistance in areas such as hydrology, social sciences, and environmental management.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Kazakhstan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project