Nurek Hydropower Rehabilitation Project Phase I

Sector: Water Supply and Storage • Location: Tajikistan

Source: World Bank Group

Project
Active

The objectives of the First Phase of Nurek Hydropower Rehabilitation Project for Tajikistan are to rehabilitate and restore the generating capacity of three power generating units of Nurek hydropower plant, improve their efficiency, and strengthen the safety of the Nurek dam. There are three components to the project, the first component being rehabilitation of the three generating units, the key

Project Information FAQ

Project Information

5 Q
The project “Nurek Hydropower Rehabilitation Project Phase I” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the First Phase of Nurek Hydropower Rehabilitation Project for Tajikistan are to rehabilitate and restore the generating capacity of three power generating units of Nurek hydropower plant, improve their efficiency, and strengthen the safety of the Nurek dam. There are three components to the project, the first component being rehabilitation of the three generating units, the key infrastructural components of the plant, and replacement of autotransformers. This component will consist of two sub-components: replacement and refurbishment of mechanical, electrical, and electromechanical equipment; and replacement of six autotransformers. The second component is the enhancement of dam safety. This component will finance activities to improve the safety of the operation of the Nurek HPP. The cost estimate for this component includes a provision for the possible mitigation measures that may be required. The cost of this component was estimated taking into account the maximum scope of activities, which may need to be implemented based on the results from ongoing seismic hazard assessment work. Therefore, the cost estimate includes a margin sufficient to implement all of the dam safety enhancement related activities, which will be required. Finally, the third component is the technical assistance. This component will support implementation of the project and strengthen the institutional capacity of BT by supporting the following: Project management consultant (PMC) to assist with the review of designs, bidding, quality control and construction supervision of the project. BT has already signed the US$5.2 million equivalent contract with PMC; (b) Panel of Experts (PoE) on matters related to dam safety and other critical aspects of the project; and (c) Technical and other engineering studies, which may be required during project implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data