Nuremberg school PPP project
One of 10,000+ projects Taiyo tracks in Germany.
Source: InfraPPPWorld
The preferred bidder will deliver a junior high school, four sports hall, outdoor sports facility and leisure facility, public transport bus stop and noise barrier. The project will be developed on a design, build, finance and maintenance (DBFM) basis for a period of 25 years after construction period. The school will accommodate 1,400 students with a gross floor area of 20 000 m².
- Status
- Closed
- Sector
- Mass Transit, Education
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Nuremberg school PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The preferred bidder will deliver a junior high school, four sports hall, outdoor sports facility and leisure facility, public transport bus stop and noise barrier. The project will be developed on a design, build, finance and maintenance (DBFM) basis for a period of 25 years after construction period. The school will accommodate 1,400 students with a gross floor area of 20 000 m². |
Original sector | Social & Health |
Procurement method |
Location
Country | Germany |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Education |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
