Nursery Boulevard Paving
Sector: Water Supply and Storage • Location: Glen Saint Mary, Florida, United States of America
Source: Dodge
This project includes the paving of Nursery Boulevard, from the power line to US 90. Major items of work include traffic control, erosion control, clearing and grubbing, earthwork, minor drainage, base construction, asphalt paving, grassing, signs and pavement markings.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Waste Processing and Treatment, Government
- Location
- Glen Saint Mary, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Nursery Boulevard Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the paving of Nursery Boulevard, from the power line to US 90. Major items of work include traffic control, erosion control, clearing and grubbing, earthwork, minor drainage, base construction, asphalt paving, grassing, signs and pavement markings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Glen Saint Mary |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
