Nursery School Aartselaar / WE-S architecten
Sector: Education • Location: Belgium
Source: ArchDaily
The result is a compact and efficient building that, despite its playful form, is effortlessly arranged within the limited boundaries of the site.The classes are organized around the central, polyvalent hall, thereby creating a particularly compact building with all classes having a direct link to the polyvalent hall. The refectory is an integral part of that hall (STEP 3).The building is situated
- Status
- Closed
- Sector
- Education, Commercial, Residential
- Location
- Belgium
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Nursery School Aartselaar / WE-S architecten
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The result is a compact and efficient building that, despite its playful form, is effortlessly arranged within the limited boundaries of the site.The classes are organized around the central, polyvalent hall, thereby creating a particularly compact building with all classes having a direct link to the polyvalent hall. The refectory is an integral part of that hall (STEP 3).The building is situated on the east side of the site and is shaped like a nine-cornered volume opening to the entrance (STEP 4) using an outdoor playroom.Text description provided by the architects.The program of demands requires 4 identical nursery classes, as well as a multifunctional hall, a refectory, some storage facilities, a kitchen, a staff room, and a nursery (STEP 1). We suggest combining the classes two by two, arranging them back to back. Each class has its storage room with sanitary facilities (STEP 2). |
Location
Country | Belgium |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Education, Commercial, Residential |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
